Quote: (Originally Posted by silent running)
Hello Underwaterbear, great idea for a poll. It will be interesting to see how many people actually post to the thread. Judging by the high % of 20 and 30 minute setup times in the poll, it seems that some may be reluctant to share the secrets of their fast setup times... -Andy
I said 30mins. It was a guess. I use an Inspo
Diluent is whipped of same tank every dive so I know thats 16:45
1: Connect whip to dill tank and start fill 2-3mins?
2: Analise 02 and connect tank 5 mins ?
3: Fill scrubber and assemble head and pos pressure test head? 5 mins ?
4: Check fill pressure on Dill disconnect from tank connect to CCR 5mins?
5: Connect head to Ts and connect 02 feed? 5mins
6: Check Interstage pressure on 02 and dill ? 1min
7: connect dill and 02 inject buttons and mouthpiece of loop? 5 mins
8: Pos pressure test inc squirt to check 02 and dill? 2min
9: Neg pressure test inc check ADV then leave in neg whilst i sort out other kit? 2min
10: Switch on check hand sets and calibrate? 5min
11: breath down unit switch off and put in neg before loading car.? 5mins
So looks like it should have been more like 45mins but to be honest I don't think it relay takes me that long. However as rigging the CCR is interspersed with sorting the rest of my dive kit its difficult to tell. I reckon it takes me about two hours to prep all kit and load the car.
ATB
Mark Chase