| Re: Drager Panorama/Golem BOV bailout scenarios I flipped the BOV hose direction to come in from diver right and mounted a swivel to it. The hose will run directly in line with the hose off the OC 2nd as seen in the picture. The Y-block will connect the two hoses behind the divers head. Then the terminating single lead hose will route down the divers left side and end in a shut off and QC.
Note the HUD mount. I'm going to run the cable all the way across the BOV and have it stick out to the left eye. Placing the standard mount outboard as far as possible on the other side allows the HUD to be viewable with the left eye. It is not possible to rig the short post on the standard side in a way that makes the HUD viewable since the HUD is positioned inboard of the post. to get the length out of the cable, it just doesn't get wound around the loop like it used to, and it is held in place with small innertube.
__________________ Eric Stadtmueller, otherwise known as, MEM "Da Pilot"
Last edited by mempilot : 5th May 2008 at 22:46.
|