Results: The Juergensen Hammerhead CCR system failed the Electrostatic Discharge. Test. Unit lost dive data, calibration of the PO2, and millivolt output of the primary display. The primary hand set will not turn off unless the battery is removed. The unit failed to display proper PO2 and millivolt output after EMI/ESD testing and post pressure pot testing. It did not display the proper PO2 at corresponding depths. See pre and post
I told him but he wouldent listen
I am curious to know if my Primary was being knocked out by my HID

Cirtainly the end result was the same but I am asming from this test it totaly fried the hand set.
ATB
Mark
__________________
Is it supposed to make that noise ?
I took my unit to the dive shop and demanded they bolt on every thing that would fit.
Join my elite diving teem and get a Tshirt "Doing It Chasey"Hammerhead Eccr Advanced Diving System